| Injection Point | West Sink Pipe diverting surface water into dig [SE08166335] |
|
| Detection Point | Dy Gill Downsteam of Timpony Joint which was flowing at the time of the test [SE08016325] |
| Tracer | OBA |
| Quantity | 0.5 litre |
| Detection Method | Cotton Wool |
| Time | less than 6 days |
| Distance | |
| Average Velocity | |
| Depth |
| Date | 10-07-2024 |
| Notes | In flood at time of test |
| Test credit | |
| References | P J Murphy pers. comm |